Forty Years in Motion, 1986–2026
Strategic Advisory & AI
Broad steps of pale marble rising to the right beside a curved, pale wall, each tread capped with brushed steel. One level line of kunzite light runs along the wall and meets the first capped tread. Beyond curved glass at the right, the sea.

Illustrative scene.

Salary increase calculator

Cost a pay award, and see who it reaches.

Try the calculator
What the film shows, in words
  1. Cost a pay award, and see who it reaches.
  2. Five grades, 200 employees.
  3. 5%: USD 180,000 a year. Grade 1 (example) is USD 75 short of the floor.
  4. The same money as a flat USD 750 each. Grade 1 (example): USD 9,250.
  5. Paid from month 4: USD 135,000 this pay year.
  6. Your figures. Your decision.
  7. Throughout, small on screen: “Illustrative example. Invented figures, not pay data.”

The demo: the worked example, one input changed at each step

ExampleStep 1 of 4Invented figures, not pay data

USD180,000
a year, with on-costs
USD135,000
this pay year: paid from month 4, 9 months

5% across five grades: USD 180,000 a year.

Width: employees in the grade. Height: average pay a year. The layer on top is the award, so its area is the money. The tallest step is shortened at its break mark; its layer is still to scale.

USD 135,000 this pay year (9 months). Each 1% costs USD 36,000. Grade 1 (example) is left below your floor of USD 9,000. New average pay USD 8,925: short by USD 75 each. Lifting 50 employees to the floor would cost USD 4,500 a year with on-costs.

The tool notes“The same money as a flat USD 750 each would lift every grade’s average above the floor.”

The pay year

  1. 1
  2. 2
  3. 3
  4. 4
  5. 5
  6. 6
  7. 7
  8. 8
  9. 9
  10. 10
  11. 11
  12. 12

USD135,000cost this pay year: paid from month 4, 9 months

The floor, enlarged

Grade 1 (example) is left below your floor of USD 9,000. New average pay USD 8,925: short by USD 75 each. Lifting 50 employees to the floor would cost USD 4,500 a year with on-costs.The same money as a flat USD 750 each would lift every grade’s average above the floor.

On-costs

USD36,000cost of each 1% of the pay bill a year, with on-costs

On-costs here are 20% of pay: an invented figure for this example, not a typical rate. The tool holds no rate.

GradeEmployeesPay nowWith 5% on payWith a flat USD 750 eachFlat sum less percentage, each
Grade 1 (example)50USD 8,500USD 8,925under the floorUSD 9,250+USD 325
Grade 2 (example)60USD 11,000USD 11,550USD 11,750+USD 200
Grade 3 (example)50USD 15,000USD 15,750USD 15,750USD 0
Grade 4 (example)30USD 22,500USD 23,625USD 23,250−USD 375
Grade 5 (example)10USD 49,000USD 51,450USD 49,750−USD 1,700

An invented pay bill of 200 employees in five grades. The figures are not pay data. The on-cost rate and the floor are invented too: the tool holds no pay data, no on-cost rate and no minimum wage.

The demo shows where the same money goes in each shape. It does not say which award is right: that is for the parties to decide.

Now your own figures. Lay the award on your stair.

Live
Work out
USD

Used when you choose “One salary”.

The award

USD
Award as

The same money, shared two ways: 5% on pay, or a flat USD 750 each. Both cost USD 150,000 a year before on-costs.

USD180,000
cost of the award a year, with on-costs at 20%
USD135,000
cost this pay year: paid from month 4, 9 months
USD36,000
cost of each 1% of the pay bill a year, with on-costs
USD3,150,000
new pay bill a year, was USD 3,000,000
USD 8,925USD 75 under the floorGrade 1 (example)USD 8,500 now
USD 11,550+USD 550 eachGrade 2 (example)USD 11,000 now
USD 15,750+USD 750 eachGrade 3 (example)USD 15,000 now
USD 23,625+USD 1,125 eachGrade 4 (example)USD 22,500 now
USD 51,450+USD 2,450 eachGrade 5 (example)USD 49,000 now
Floor USD 9,000

Width: employees in the grade. Height: average pay a year. The layer on top is the award, so its area is the money. The tallest step is shortened at its break mark; its layer is still to scale.

Show as

Shown: your award, 5% on pay. Both cost USD 150,000 a year before on-costs.

GradeEmployeesPay nowWith 5% on payWith a flat USD 750 eachFlat sum less percentage, each
Grade 1 (example)50USD 8,500USD 8,925under the floorUSD 9,250+USD 325
Grade 2 (example)60USD 11,000USD 11,550USD 11,750+USD 200
Grade 3 (example)50USD 15,000USD 15,750USD 15,750USD 0
Grade 4 (example)30USD 22,500USD 23,625USD 23,250−USD 375
Grade 5 (example)10USD 49,000USD 51,450USD 49,750−USD 1,700

Grades (pay a year, gross)

  1. 01
  2. 02
  3. 03
  4. 04
  5. 05

Each step of the stair carries the number of its row. Press a step to go to its row; type a headcount to widen it, a pay to raise it.

The pay year

USD135,000cost this pay year: paid from month 4, 9 months

of your 12-month pay year

Month 1 is the first month of your pay year: the award is then paid for all twelve months.

The floor, enlarged

Grade 1 (example) is left below your floor of USD 9,000. New average pay USD 8,925: short by USD 75 each. Lifting 50 employees to the floor would cost USD 4,500 a year with on-costs.The same money as a flat USD 750 each would lift every grade’s average above the floor.

USD a year

Any lowest rate you want tested, such as an agreed minimum. Enter 0 for none. The tool holds no minimum wage.

On-costs

USD36,000cost of each 1% of the pay bill a year, with on-costs

% of pay

Your own figure for what the employer pays on top of pay, such as pension or social security contributions. The tool holds no rate.

Every figure is your own. The tool holds no pay data, no on-cost rate and no minimum wage, and it states no law. The floor is tested against each grade’s average pay: people paid below the average can still be under it.

New pay by grade, the two shapes side by side, and what the tool notes

The tool’s own tables and notes, in full, on the figures above. Amounts are shown to the whole unit and worked unrounded, so a column of rounded rises can differ from its total by a unit or two.

USD180,000cost of the award a year, with on-costs at 20%
USD135,000cost this pay year: paid from month 4, 9 months
USD36,000cost of each 1% of the pay bill a year, with on-costs
USD3,150,000new pay bill a year, was USD 3,000,000
New pay by grade: 5% on pay
On-costs are added in the totals above, not in this table.
GradeEmployeesAverage pay nowNew average payRise eachRiseCost a year, pay only
Grade 1 (example)50USD 8,500USD 8,925USD 4255.0%USD 21,250
Grade 2 (example)60USD 11,000USD 11,550USD 5505.0%USD 33,000
Grade 3 (example)50USD 15,000USD 15,750USD 7505.0%USD 37,500
Grade 4 (example)30USD 22,500USD 23,625USD 1,1255.0%USD 33,750
Grade 5 (example)10USD 49,000USD 51,450USD 2,4505.0%USD 24,500
All grades200USD 15,000USD 15,750USD 7505.0%USD 150,000
Rise for each employee, by grade (your award, USD)
  1. Grade 1 (example)5.0% of payUSD 425
  2. Grade 2 (example)5.0% of payUSD 550
  3. Grade 3 (example)5.0% of payUSD 750
  4. Grade 4 (example)5.0% of payUSD 1,125
  5. Grade 5 (example)5.0% of payUSD 2,450
The same money, shared two ways: 5% on pay, or a flat USD 750 each
Both cost USD 150,000 a year before on-costs.
GradeNew pay with 5%New pay with a flat USD 750Flat sum less percentage, eachRise with the flat sum
Grade 1 (example)USD 8,925USD 9,250+USD 3258.8%
Grade 2 (example)USD 11,550USD 11,750+USD 2006.8%
Grade 3 (example)USD 15,750USD 15,750USD 05.0%
Grade 4 (example)USD 23,625USD 23,250−USD 3753.3%
Grade 5 (example)USD 51,450USD 49,750−USD 1,7001.5%
Differentials: the step from each grade to the next one up
Grades are taken in order of current average pay.
StepNowWith 5%With a flat USD 750
Grade 1 (example) to Grade 2 (example)29.4%29.4%27.0%
Grade 2 (example) to Grade 3 (example)36.4%36.4%34.0%
Grade 3 (example) to Grade 4 (example)50.0%50.0%47.6%
Grade 4 (example) to Grade 5 (example)117.8%117.8%114.0%
Highest to lowest (ratio)5.765.765.38

What it shows

  • Gap: Grade 1 (example) is left below your floor of USD 9,000.New average pay USD 8,925: short by USD 75 each. Lifting 50 employees to the floor would cost USD 4,500 a year with on-costs.
  • Note: The same money as a flat USD 750 each would lift every grade’s average above the floor.
  • Note: A percentage keeps every differential as it is; a flat sum narrows them.Highest to lowest average pay is 5.76 to 1 now, 5.76 to 1 with 5% and 5.38 to 1 with a flat USD 750.
  • Note: Every figure is your own.The tool holds no pay data, no on-cost rate and no minimum wage, and it states no law. The floor is tested against each grade’s average pay: people paid below the average can still be under it.

Practice 12: Human resources & workforce advisoryFree · instant results · full report by emailTool owner: Benjamin Kobina OseiVersion 1.0 ·

On the figures above

USD180,000
cost of the award a year, with on-costs at 20%
USD135,000
cost this pay year: paid from month 4, 9 months
USD36,000
cost of each 1% of the pay bill a year, with on-costs

Your full report

Costed offer sheet, in your inbox.

  • New pay by grade
  • The cost for a full year
  • The cost for this pay year
  • The cost of each one per cent
  • The percentage beside the flat sum
  • Your assumptions

We use your email to send what you ask for. Nothing you enter is sent until you press a button. Privacy notice

· or Book now, a paid consultation with a principal of the firm

How it is worked out, and its limits.

The same money can be laid thick on the high steps or evenly on all of them. The tool works out both and recommends neither.

Method, line 3: the same money both ways, on the figures now in the calculator.

The wedge: 5% on pay

The band: a flat USD 750 each

Both cost USD 150,000 a year before on-costs. The two layers have the same area.

Method

  1. 01

    One salary: new salary = current salary × (1 + percentage ÷ 100), or current salary + the flat sum. A month is one twelfth of a year.

  2. 02

    Pay bill: cost a year = the rise for each grade × its headcount, added up, then × (1 + on-costs ÷ 100). Cost this pay year = cost a year × the months left ÷ 12. Each 1% costs the pay bill ÷ 100 × (1 + on-costs ÷ 100).

  3. 03

    The comparison uses the same money both ways: a flat sum = cost ÷ headcount; a percentage = cost ÷ pay bill. A differential is one grade’s average pay ÷ the next grade down, less 1.

  4. 04

    A grade is flagged when its new average pay is below the floor you entered. Amounts are shown to the nearest whole unit and worked on the unrounded figures.

What it cannot tell you

  • It works on gross pay. Tax, deductions and take-home pay are not worked out.
  • On-costs are one percentage of pay that you enter; real contributions can have thresholds and caps.
  • It works on each grade’s average pay, so it cannot see the spread inside a grade: someone paid below the average can be under a floor the average clears.
  • Increments, promotions, allowances and overtime are costed only if they are in the averages you enter.
  • It holds no pay data, no minimum wage and no law, and it is not a negotiating mandate or advice on what to offer or accept.

Quality ruleEvery figure is the visitor’s own: no pay data, on-cost rate, minimum wage or law is held, and nothing is converted.

A close, oblique view along two stone treads capped with brushed silver. The lower cap is a plate of even thickness; the upper one is visibly thicker. A line of kunzite light falls across the lower riser.

Illustrative scene.

The same metal, laid thick on the high step or evenly on all.

Questions people ask.

How do you calculate a salary increase?

Multiply the current salary by the percentage and divide by 100 to get the rise, then add it to the current salary. A 5% rise on 24,000 is 1,200, so the new salary is 25,200.

What does a pay award cost for part of a year?

The full-year cost multiplied by the months it is paid for and divided by 12. An award paid from month 4 of a pay year is paid for 9 months, so it costs nine twelfths of the full-year figure in that year and the whole figure every year after.

Percentage or flat sum: what is the difference?

A percentage gives the same proportion to everyone, so higher grades receive more money and the gaps between grades stay as they were. A flat sum gives everyone the same money, so lower grades gain more in proportion and the gaps narrow. The tool shows both at the same cost; which is right is for the parties to decide.

The calculator costs an award. Agreeing one is the work.

It holds no pay data, no minimum wage and no law, and it is not a negotiating mandate or advice on what to offer or accept. These are the services that do that work, and the consulting partner who leads them.

Benjamin Kobina OseiConsulting Partner, Human Resources & Workforce AdvisoryRead his professional record
Book now Starts with a paid consultation with a principal of the firm.