
Illustrative scene.
The film is unavailable. You can read what it shows below.
What the film shows, in words
- See what must be agreed before work starts.
- NDA signed. Data handling and change control still open. Not yet to start.
- Data handling agreed. One part still missing.
- A change-control rule in writing. Ready to start.
- Three acceptance tests: one by the partner, one by both, one by the agency. Due in 35 days.
- No client contact. No portfolio use.
The demo: the worked example, one field at a time
ExampleAn agency commissioning a market study under its own brand (illustrative).
The NDA is signed. Two things still stop the start.
Step 1 of 4
3 acceptance criteria, due 29 Dec 2026. The tool says “Not yet” to start. Its flags: Data handling is not agreed. No change-control rule. The floor is in; the back wall and the roof are outlines.
Data handlingData handling is not agreed.
Not yet to start2 to agree before work starts
123No client contactFrosted
No portfolio useFrosted
The end client’s side
Due to the agency 29 Dec 2026
Data handlingData handling is not agreed.
Not yet to start2 to agree before work starts
123No client contactFrosted
No portfolio useFrosted
The end client’s side
Due to the agency 29 Dec 2026
- Floor: NDA. Signed
- Back wall: Data handling. Data handling is not agreed.
- Roof: Change control. No change-control rule.
- Screen: No client contact. Frosted
- Screen: No portfolio use. Frosted
On the bench
- Deliverable
- Market study: packaged foods in Ghana, 40 pages, agency template
- Version naming
- StudyGH_v0.1 for drafts, v1.0 for final
- Due to the agency
- 29 Dec 2026
What is still open
- Stops the startData handling is not agreed. Agree where files live, who can see them and when they are deleted.
- Stops the startNo change-control rule. Without one, scope creep lands on whoever has the least leverage.
Who tests
- 1Every figure has a dated sourceTest: Source table checked line by line. Tested by the partner.
- 2Follows the agency template and style guideTest: Template checklist. Tested by the agency.
- 3No partner branding or names anywhereTest: Search the file and its metadata. Tested by both.
Now your own handover, part by part.
Define the deliverable, the acceptance tests and the rules.
What the tool says
Before work starts
- Gap: Data handling is not agreed.Agree where files live, who can see them and when they are deleted.
- Gap: No change-control rule.Without one, scope creep lands on whoever has the least leverage.
Handover pack
Deliverable
Market study: packaged foods in Ghana, 40 pages, agency template
- Due: 29 Dec 2026
- Versions: StudyGH_v0.1 for drafts, v1.0 for final
Acceptance
- Every figure has a dated source. Test: Source table checked line by line. Tested by: partner.
- Follows the agency template and style guide. Test: Template checklist. Tested by: agency.
- No partner branding or names anywhere. Test: Search the file and its metadata. Tested by: both.
Confidentiality
- NDA: signed
- End-client contact: only when the client agrees
- Portfolio use: none
- Data handling: NOT agreed
Change control
NOT agreed
By emailThe pack the checklist drafts, as your handover stands
Not yet to start2 to agree before work starts. Data handling is not agreed. No change-control rule.
Handover pack
Deliverable
Market study: packaged foods in Ghana, 40 pages, agency template
- Due: 29 Dec 2026
- Versions: StudyGH_v0.1 for drafts, v1.0 for final
Acceptance
- Every figure has a dated source. Test: Source table checked line by line. Tested by: partner.
- Follows the agency template and style guide. Test: Template checklist. Tested by: agency.
- No partner branding or names anywhere. Test: Search the file and its metadata. Tested by: both.
Confidentiality
- NDA: signed
- End-client contact: only when the client agrees
- Portfolio use: none
- Data handling: NOT agreed
Change control
NOT agreed

Illustrative scene.
How it checks, and its limits.
- 01
The pack is ready only when an NDA is signed, data handling and change control are agreed, and there is at least one acceptance criterion, each with a test.
- 02
Each criterion names who tests it: the agency, the partner or both.
- 03
On your own deliverable the pack also needs a support commitment after handover: a side that owns it, a named owner, what is agreed, and agreed in writing. Deleting every arrangement does not remove that need. Other arrangements with a gap are listed as open and do not stop the start. The worked example has nothing entered after handover: where it reads “Ready” it is an illustration, and says so. Once you change its deliverable, due date, version naming or a criterion, or write a change rule of your own, the pack is yours and support is asked for; keeping the example’s title does not make it the example.
As the tool is built todayThe verdict turns on the NDA, data handling, change control and the acceptance criteria: at least one, each with a test. A criterion without a test stops “Ready”. So does a missing support commitment on your own deliverable, whether or not an arrangement after handover is entered. The three parts of the room are equal: the tool ranks none above another.
What it cannot tell you
It is a checklist, not a contract; put the terms in writing.
- Your client contract may impose rules the partner must also follow.
- It does not assess the partner’s quality.
Quality ruleIncludes confidentiality, versions and change-control check.
When the work goes out under the agency’s name.
The checklist records what two sides say they have agreed. Talking a white-label arrangement through is a service.

Kenneth GagakumaTool ownerBook Kenneth · from USD 90
Not yet to start2 to agree before work starts
Starts with a paid consultation with Kenneth Gagakuma. The verdict beside the button is the checklist’s reading of the entries in the tool above; it is not clearance.

Illustrative scene.
