Demonstration · not a client result
EU AI Act Article 50 what the deliverable looks like
The structure of the deliverable for EU AI Act Article 50, how it is produced and how you accept it, with a live specimen generated from the matching free tool’s worked example. Synthetic or permitted data only.
What this page isDemonstration
- Practice
- 04 AI governance & assurance
- The deliverable
- 4 sectionsProduced in 5 stages, each with a review point
- Data
- Synthetic or permittedNot a client result
Demonstration of methodSynthetic or permitted data.Not a client result.
The deliverable, section by section.
What you receive, and what each part is for.
System inventory
The AI systems and outputs in scope.
DemonstrationApplicability note
Which obligations apply to you as provider or deployer, and why.
DemonstrationControl set
Disclosure, labelling and marking controls, with examples.
DemonstrationOwner and review plan
Who runs each control and when it is checked.
DemonstrationA live specimen.
Generated from the worked example in EU AI Act Article 50 checklist: synthetic data, real method. Change the inputs in the tool to see your own.
Demonstration · synthetic data · not a client result
Article 50 transparency checklist
Article 50(1), via your provider
- Confirm with your provider how people are told they are interacting with AI, and keep that confirmation.
- Keep your own notice in place where you configure the conversation.
Article 50(5): how the information is given
- Give the information clearly and distinguishably, at the latest at the first interaction or exposure, and in an accessible way.
Before you rely on this
- Check: Dates and details can change.Article 50 applies from 2 August 2026. The Digital Omnibus on AI (Regulation (EU) 2026/1744) postponed the Article 50(2) marking duty to 2 December 2026. Check the current text and Commission guidance before publication.
An evidence checklist for review by a qualified adviser. It is not legal advice and gives no compliance badge.
How it is produced, and accepted.
Each stage ends in something you review; acceptance is tested against criteria agreed at the start.
- 01
Inventory
List the system, its outputs and where they reach EU audiences.
Review pointInventory of systems and data in scope, confirmed by you.
- 02
Applicability
Determine your role and the obligations that apply.
Review pointApplicability findings reviewed before controls are drafted.
- 03
Controls
Design the disclosure and marking controls.
Review pointControls agreed with the people who will run them.
- 04
Ownership
Assign owners and train them.
Review pointOwners named and accepted in writing.
- 05
Review
Set the review cadence and evidence to keep.
Review pointReview date set, with what will be checked.
How proof is labelled
- DemonstrationsDemonstrations use synthetic or permitted data.
- Documented experienceDocumented experience is attributed to the organisation that held the work.
- Measured resultsMeasured results are added only once they have been measured; none are shown yet.
What needs to move forward?
Tell us the decision, the challenge or the opportunity. We reply with a scoped approach, a named principal and a fee before any work begins.
No charge to submit an enquiry.
